Installation conditions

Installation of gas heater 3/570,00 GEL
Installation of gas heater 8/1085,00 GEL
Dismantling of the gas heater30,00 GEL
Installation of stove/top panel20,00 GEL
Dismantling of the stove20,00 GEL
Dismantling the hood25,00 GEL
Hood installation45,00 GEL
Dismantling the tank30,00 GEL
E-buck installation 45,00 GEL
Installation of electronic tank over 80 liters55,00 GEL
Installation of the valve65,00 GEL
Installation of standing air conditioner75,00 GEL
Air conditioner 070/071 installation180,00 GEL
Air conditioner 090/091 installation180,00 GEL
Air conditioner 120/121 installation180,00 GEL
Air conditioner 180/181 installation200,00 GEL
Air conditioner 240/241 dismantling100,00 GEL
Air conditioner 240/241 installation200,00 GEL
Installation of air conditioner 480/481 Stayash300,00 GEL
Air conditioner dismantling 09/12/80,00 GEL
Dismantling of air conditioner 500/480120,00 GEL
Dismantling the refrigerator25,00 GEL
Dismantling the washing machine20,00 GEL
Dryer installation/tubular dryer installation50,00 GEL
Installation of the dryer on the s/m with brackets35,00 GEL
TV installation25,00 GEL
TV installation above 4350,00 GEL
Dismantling of the central heating boiler75,00 GEL
Central heating boiler installation150,00 GEL
Dismantling the dishwasher20,00 GEL
Changing the direction of the refrigerator door40,00 GEL   
What does the standard installation include: 
1. Washing machine/dishwasher - connecting the item to the wet points brought to the installation site and to the power source. In other cases, payment is made by the user. 
 2. Electric oven/cooker - connecting the item to the gas pipe and power source brought to the installation site. In other cases, payment is made by the user. 
 3. Air conditioner - drilling a 45 cm thick brick or block wall, attaching the outdoor unit to the bracket, connecting the indoor and outdoor unit together with standard pipes. (Cold concrete, monolithic wall and other non-standard wall do not include standard installation) 
 4. Heater - drilling a 45 cm thick brick or block wall to connect the gas pipe brought by the user to the installation site. (Cold concrete, monolithic wall and other non-standard wall do not include standard installation)